Feature · RAMS

Risk assessments and method statements, structured step by step.

RAMS means risk assessments and method statements. Build them from a hazard library and a guided seven-stage workflow — you supply the job-specific detail and a named person signs off before anything is shared.

How the RAMS builder works

Step 1
Work through the guided stages
A seven-stage workflow walks you through scope, hazards, controls and method — so nothing important is skipped.
Step 2
Draw on the hazard library and risk matrix
Pick from a structured hazard library and record residual risk against a clear matrix. Completeness checks flag missing answers.
Step 3
Sign off and publish a fixed version
A named person reviews and signs off before release. Publishing creates an immutable version while your draft can keep evolving.

The RAMS build flow

1

Scope

Define the task and site.

2

Hazards

Select from the hazard library.

3

Controls

Record controls and residual risk.

4

Method

Write the method statement.

5

Sign off

A named person signs and publishes.

What you get

  • Seven-stage guided workflow
  • Structured hazard library
  • Risk matrix with residual-risk scoring
  • Missing-answer and completeness checks
  • Named sign-off before release
  • Immutable published versions

Templates and checks are starting points, not approvals. JobDocs does not certify that a RAMS document is safe, compliant or fit for a specific job — job-specific completion and named sign-off remain your responsibility.

Build your next RAMS with confidence